Project Description

Tru-Flow Services was involved with Kane Constructions on this six-level building. Located within the operational campus of Greenslopes Private Hospital and next to the functioning Keith Payne Unit, it contains 31 consulting suites over the upper three floors, with 124 car spaces on the lower three floors, together with roof mounted mechanical plant.

The car parking floors will connect into the existing adjacent car park.

Work Included

  • Hydraulics
  • Drainage
  • Water Supply
  • Gas
  • Civil